Utility figures must come from the proposed equipment and its operating sequence. Use this checklist to collect the site conditions needed for a meaningful configuration review.

01

Collect conditions at the equipment

State the available electrical supply and identify relevant site requirements. Describe steam, compressed air and other services at their intended points of use, where required by the proposed design. Central plant figures may not describe the conditions delivered to the head. Include variability and the monitoring arrangement.

02

Separate production and cleaning demands

The utility duty during filling can differ from cleaning or pre-sterilization. Obtain the supplier’s demand schedule for each operating mode, including flow, quality and connection details. Confirm cleaning supply and return, drain routes and the components covered by each circuit. Do not assign generic utility figures to an unselected model.

03

Make the layout practical

Include package traffic, operator access, guarded movement, maintenance and change-part removal. Provide container dimensions and filled loads alongside available floor information. Mark connection points and the upstream product boundary on a simple layout. Agree responsibilities for service installation and testing before equipment acceptance.

PRACTICAL ANSWERS

Frequently asked questions

Is steam always required?

The treatment and pre-sterilization method depends on the actual equipment design and established process. Obtain the proposed duty and service specification.

Can I use generic air or water requirements?

Use the supplier’s specification at each point of use. Service quality, pressure and flow need to match the duty and validation basis.

What should I send for a site review?

Send the proposed layout, available utilities, package dimensions and filled loads, upstream connection details and access or installation restrictions.

CONTINUE YOUR SELECTION

Compare the alternatives.

FROM REQUIREMENT TO CONFIGURATION

Let’s define your filling project.

Share the product, package and output you need. Use the actual fitment and operating conditions to compare suitable equipment.

Start your enquiry ↗